Mevzuat Listesine Dön

SGK General Letter: Regarding Research Procedures to be Conducted in Special Nature Construction Works.

19 Ekim 2026
3 dk okuma

As is known, the minimum labor cost research processes carried out within the scope of Article 85 of Law No. 5510 have been updated within the scope of the Regulation on Amendments to the Social Insurance Procedures Regulation published in the Official Gazette No. 33255 dated 16.05.2026, and the relevant sections of the General Letter No. 2011/13 titled "Certificate of No Debt" have been rearranged in accordance with this update.

Feedback received from units and employers has revealed that there are some ambiguities in the research processes conducted for construction works of special nature, where the class and group of the structure change, as well as due to the request for a partial certificate of no debt, and the issues specified below need clarification.

1) Research Procedure to be Conducted in Case of Change of Structure Class and Group or Absence in the Years of Calculation Article 111, paragraph four of the Social Insurance Procedures Regulation states that "the research process is carried out based on the building permit valid at the time of completion of the work." This provision is also included in section 6.6 of the General Letter No. 2011/13, amended by General Letter No. 2026/16, stating that "(...) In the case where there is no unit cost for the year to be used in the calculation, correspondence will be made with the Provincial Directorates of Environment, Urbanization and Climate Change to ask which unit cost should be taken as a basis, and the process will be carried out according to the response received.

In the event that the unit cost cannot be determined as a result of correspondence with the Provincial Directorates of Environment, Urbanization and Climate Change, the class and group of the structure to be taken as a basis in the research process will be determined by the unit from the approximate unit cost list published by the Ministry of Environment, Urbanization and Climate Change, considering the purpose of use, nature, and characteristics of the structure.

If it cannot be determined by the unit or if the employer objects to the determined unit cost, the file will be referred to the social security inspectors' service for the purpose of determining the purpose of use, nature, and characteristics of the structure, and the class and group of the structure to be taken as a basis in the research process will be determined by the unit from the approximate unit cost list published by the Ministry of Environment, Urbanization and Climate Change based on the findings in the report prepared by the inspector.

According to these regulations, the same section 6.6 of the General Letter has been explained with examples, and in Example 3; "The construction work in the IV-A class and group started on 15.11.2023. A project amendment permit was obtained in 2025, and the class and group of the construction changed to III-C. The construction was completed on 17.05.2026. In this case; the unit cost for 2023 in IV-A: 10,200 TL/m² the unit cost for 2024 in IV-A: 15,300 TL/m² the unit cost for 2025 in III-C: 19,150 TL/m² The unit cost to be used in the calculation will be: (10,200 + 15,300 + 19,150) /3 = 14,883.33 TL/m²."

In Example 6; "The construction work that started on 15.04.2023 was completed on 17.05.2026. A permit was obtained on 20.05.2026 after the work was completed. The class and group of the construction have been determined as III-C. No unit cost for III-C has been determined by the Ministry of Environment, Urbanization and Climate Change for the years 2023 and 2024.

In this case; Considering the purpose of use, nature, and characteristics of the structure, it will be asked to the Provincial Directorate of Environment, Urbanization and Climate Change which class and group should be taken as a basis for the years 2023 and 2024, and the process will be carried out according to the response received.

If the unit cost cannot be determined as a result of correspondence with the Provincial Directorate of Environment, Urbanization and Climate Change, the unit cost values to be determined by the unit for the class and group to be determined for the years 2023 and 2024 will be used in the calculation, considering the purpose of use, nature, and characteristics of the structure.

If the unit cost cannot be determined by the unit or if the employer objects to the determined unit cost, the file will be referred to the social security inspectors' service for the purpose of determining the purpose of use, nature, and characteristics of the structure, and the unit cost values determined by the unit for the class and group will be used in the calculation.

As can be understood from the aforementioned regulations, in the research processes to be conducted for special nature construction works, it is necessary to take the building permit valid at the date of completion of the construction as a basis, as required by the fourth paragraph of Article 111 of the Social Insurance Procedures Regulation.

In the absence of a structure class and group for the year to be taken as a basis in the calculation (of the relevant year) in the Communiqué on Approximate Unit Costs to be Used in the Calculation of Architecture and Engineering Service Fees, the research process will be carried out based on the structure class and group of previous years.

This situation has been detailed in the third example in section 6.6 of General Letter No. 2026/16.

In the case of obtaining a permit for the first time after the construction is completed, the procedures to be followed are detailed in the sixth example in section 6.6 of General Letter No. 2026/16.

In the event of obtaining a project amendment permit and changing the class and group of the construction, if the structure class and group for the year to be taken as a basis in the calculation is available in the relevant year's Communiqué, the process will be carried out according to the following example based on the fourth paragraph of Article 111 of the Social Insurance Procedures Regulation.

Example 1: The construction work in the III-A class and group started on 15.11.2023. A project amendment permit was obtained in 2025, and the class and group of the construction changed to IV-B. The construction was completed on 17.05.2026.

In this case; the unit cost for 2023 in IV-B: 12,050 TL/m² the unit cost for 2024 in IV-B: 17,400 TL/m² the unit cost for 2025 in IV-B: 27,500 TL/m² The unit cost to be used in the calculation will be: (12,050 + 17,400 + 27,500) /3 = 18,983.33 TL/m².

2) Research Procedure to be Conducted for Remaining Sections After Issuance of Partial Certificate of No Debt Article 111, paragraph seven of the Social Insurance Procedures Regulation states that the research process must be conducted after the completion date of the construction, but it can also be conducted at any stage of the construction in case of necessity.

Article 24 of the Social Security Inspectorate Regulation states that "Inspectors and assistant inspectors, including the inspection reasons forwarded from the social security center directorate, upon the written order given by the provincial director or the deputy provincial director or the center director assigned by him; a) As a result of the examination, inspection, and control to be carried out; 1) The current status of the workplace, including those constructed without a permit if necessary, will be determined to identify the class and group of special building constructions, the nature and area of the construction, the levels of the completed parts of unfinished constructions, the start and completion dates, (...) will be determined, (...) and the procedures for recording the statements of the relevant parties in the minutes will be carried out." In section 9.19.4 of General Letter No. 2011/13, it is stated that "(...) In the research processes conducted after the issuance of a partial certificate of no debt, the areas of the sections that were completed earlier and for which a partial certificate of no debt was issued will not be taken into account in the final calculation.

Therefore, amounts exceeding the prime basis that should be reported to the Institution will not be considered in the subsequent calculation.

After the employer's request for a partial certificate of no debt, the research process will be carried out based on the completion level and completion date of the construction determined as a result of correspondence with the competent authorities.

In the research processes to be conducted after the issuance of a partial certificate of no debt, the areas of the sections that have been previously calculated will not be taken into account in the subsequent calculations.

Additionally, in cases where multiple blocks are constructed, each having separate permits, and the transactions are carried out through a single workplace file as per the eighth paragraph of Article 27 of the Social Insurance Procedures Regulation, when the employer applies for a partial certificate of no debt for one block, the level determination reports for all blocks in the workplace file will be requested from the competent authority, and the research process will be carried out based on the total m² completed in the workplace file.

Thus, when constructions are carried out as multiple blocks and the transactions are conducted through a single workplace file, and when the employer applies for a partial certificate of no debt, if the competent authority reports the level determination for all blocks separately, the procedures to be followed will be explained in the example below.

Example 2: RK İnşaat Ltd. Şti. has opened a single workplace file for a total of 12,000 m² construction work consisting of three blocks, each having separate permits, as per the eighth paragraph of Article 27 of the Social Insurance Procedures Regulation.

The information regarding the construction is as follows: Block A 4,000 m², class and group III-B Block B 4,000 m², class and group III-B Block C 4,000 m², class and group III-B.

The start date of the construction is 01.03.2025.

The employer applied to the Institution on 17.07.2026, stating that the construction of Block A was completed and requested a certificate of no debt for Block A, which is 4,000 m².

To determine the completion level and completion date of the construction, correspondence was made with the relevant municipality (although the employer requested a certificate of no debt for Block A, level determination reports for Blocks B and C will also be requested) and in the response from the municipality, it was reported that as of 30.06.2026; Block A was completely finished, Block B was 75% completed, and Block C was 50% completed.

As of 01.07.2026, insured reporting continued.

The total prime basis reported to the Institution as of 30.06.2026 is: 2025 year prime basis report 7,000,000 TL 2026 year prime basis report 5,000,000 TL totaling 12,000,000 TL.

In this case, the completion level of the construction is: Block A corresponding to the total (4,000 m²) Block B corresponding to 75% (3,000 m²) Block C corresponding to 50% (2,000 m²) research will be conducted over 9,000 m² (since 75% of the total construction area has been completed).

The approximate unit cost for 2025 is 18,200 TL, and the minimum labor cost to be reported to the Institution based on the completed part of 9,000 m² is; (9,000x18,200x6.75/100) = 11,056,500 TL.

When the amount to be reported (11,056,500 TL) is compared with the amount reported until 30.06.2026 (12,000,000 TL) (12,000,000-11,056,500= 943,500 TL), it is determined that there is sufficient reporting, and as of 30.06.2026, since it has been determined that there are no debts from the special nature construction workplace, a partial certificate of no debt will be issued for the construction area of 4,000 m² (Block A).

Additionally; if requested by the employer, a partial certificate of no debt can also be issued for Blocks B and C (up to the requested portions) without further calculation, for up to 3,000 square meters of Block B and 2,000 square meters of Block C.

The employer requested a certificate of no debt for Block B on 16.09.2026.

To determine the completion level and completion date of the construction, correspondence was made with the relevant municipality, and in the response from the municipality, it was reported that as of 08.09.2026; Block B was completely finished, and Block C was 75% completed.

As of 09.09.2026, insured reporting continued.

The prime basis reported to the Institution between 01.07.2026 and 08.09.2026 is 2,000,000 TL.

In this case; since the 3,000 m² part of Block B and the 2,000 m² part of Block C were included in the first research process, they will not be used in the subsequent calculations.

Accordingly; research will be conducted over 2,000 m² corresponding to Block B (1,000 m² corresponding to the total of Block B (4,000 m²-3,000 m²=) and 1,000 m² corresponding to 75% of Block C (3,000 m²-2,000 m²=)).

The approximate unit cost for 2026 is 21,050 TL, and the minimum labor cost to be reported to the Institution based on the completed part of 2,000 m² is; (2,000x21,050x6.75/100) = 2,841,750 TL.

When the amount to be reported (2,841,750 TL) is compared with the amount reported to the Institution (2,000,000 TL); (2,841,750 – 2,000,000 =) 841,750 TL of insufficient labor reporting has been identified.

The reported insufficient labor amount will be notified to the employer by accruing it to the month of September 2026, in which the completion date (08.09.2026) is located, along with any delay penalties and interest.

If the amount notified is paid by the employer within one month from the date of notification and there are no other debts from the relevant workplace file, a partial certificate of no debt will be issued for 4,000 m² of Block B.

When a request for a certificate of no debt for Block C is made by the employer at a later date, the research process will be conducted over the 2,000 m² that have not been researched, as the 3,000 m² included in the previous research process will not be used in the subsequent calculations, and if there are no outstanding premium debts or if the outstanding premium debts are paid, a certificate of no debt will be issued for the entire Block C of 4,000 m².

Example 3- A single workplace file has been opened for the construction work consisting of three blocks, each having separate permits, by DS İnşaat Ltd. Şti. as per the eighth paragraph of Article 27 of the Social Insurance Procedures Regulation.

The information regarding the construction is as follows: Block A 4,000 m², class and group III-B Block B 4,000 m², class and group III-B Block C 4,000 m², class and group III-B.

The start date of the construction is 01.03.2023.

The employer applied to the Institution on 17.07.2026 and requested a certificate of no debt for Block A.

To determine the completion level and completion date of the construction, correspondence was made with the relevant municipality, and in the response from the municipality, it was reported that as of 31.12.2023, the completion level of Block A was 100%, the completion level of Block B was 75% as of 31.12.2024, and the completion level of Block C was 50% as of 30.06.2026.

As of 01.07.2026, insured reporting continued.

The total prime basis reported to the Institution as of 30.06.2026 is: 2023 year prime basis report 2,000,000 TL 2024 year prime basis report 3,000,000 TL 2025 year prime basis report 4,000,000 TL 2026 year prime basis report 3,000,000 TL totaling 12,000,000 TL.

Since the last level determination report prepared for the construction was dated 30.06.2026, the completion date of the work will be taken as 30.06.2026, and the research process will be carried out based on the total level completed by this date and the total prime basis reported until this date.

The area measurements and prime basis used in the calculations will not be taken into account in subsequent calculations.

In this case, the completion level of the construction is: Block A corresponding to the total (4,000 m²) Block B corresponding to 75% (3,000 m²) Block C corresponding to 50% (2,000 m²) research will be conducted over 9,000 m².

The unit cost for 2023 in III-B is: 9,000 TL/m² the unit cost for 2024 in III-B is: 14,400 TL/m² the unit cost for 2025 in III-B is: 18,200 TL/m² The unit cost to be used in the calculation will be: (9,000 + 14,400 + 18,200) /3 = 13,866.66 TL/m².

Accordingly; the minimum labor cost to be reported to the Institution is (9,000x13,866.66x6.75/100) = 8,423,995.95 TL.

When the amount to be reported (8,423,995.95 TL) is compared with the amount reported until 30.06.2026 (12,000,000 TL) (12,000,000-8,423,995.95=) 3,576,004.05 TL sufficient reporting has been identified, and as of 30.06.2026, since it has been determined that there are no debts from the special nature construction workplace, a partial certificate of no debt will be issued for the construction area of 4,000 m² (Block A).

Additionally; if requested by the employer, a partial certificate of no debt can also be issued for Blocks B and C (up to the requested portions) without further calculation, for up to 3,000 square meters of Block B and 2,000 square meters of Block C.

The employer requested a certificate of no debt for Block B on 16.09.2026.

To determine the completion level and completion date of the construction, correspondence was made with the relevant municipality, and in the response from the municipality, it was reported that as of 08.09.2026; Block B was completely finished, and Block C was 50% completed.

As of 09.09.2026, insured reporting continued.

The prime basis reported to the Institution between 01.07.2026 and 08.09.2026 is 1,000,000 TL.

Since the last level determination report prepared for the construction was dated 08.09.2026, the completion date of the work will be taken as 08.09.2026, and the research process will be carried out.

In this case; since the 3,000 m² part of Block B and the 2,000 m² part of Block C were included in the first research process, they will not be used in the subsequent calculations.

Accordingly; research will be conducted over 1,000 m² corresponding to Block B.

The approximate unit cost for 2026 is 21,050 TL, and the minimum labor cost to be reported to the Institution based on the completed part of 1,000 m² is; (1,000x21,050x6.75/100) = 1,420,875 TL.

When the amount to be reported (1,420,875 TL) is compared with the amount reported to the Institution (1,000,000 TL); (1,420,875– 1,000,000 =) 420,875 TL of insufficient labor reporting has been identified.

The reported insufficient labor amount will be notified to the employer by accruing it to the month of September 2026, in which the completion date (08.09.2026) is located, along with any delay penalties and interest.

If the amount notified is paid by the employer within one month from the date of notification and there are no other debts from the relevant workplace file, a partial certificate of no debt will be issued for 4,000 m² of Block B.

When a request for a certificate of no debt for Block C is made by the employer at a later date, the research process will be conducted over the 2,000 m² that have not been researched, as the 2,000 m² included in the previous research process will not be used in the subsequent calculations, and if there are no outstanding premium debts or if the outstanding premium debts are paid, a certificate of no debt will be issued for the entire Block C of 4,000 m².

Example 4: MÇ İnşaat Ltd. Şti. has opened a single workplace file for the construction work consisting of three blocks, each having separate permits, as per the eighth paragraph of Article 27 of the Social Insurance Procedures Regulation.

The information regarding the construction is as follows: Block A 4,000 m², class and group III-B Block B 4,000 m², class and group III-B Block C 4,000 m², class and group III-B.

The start date of the construction is 01.03.2023.

The employer applied to the Institution on 17.07.2026 and requested a certificate of no debt for Block A.

To determine the completion level and completion date of the construction, correspondence was made with the relevant municipality, and in the response from the municipality, it was reported that as of 31.12.2025, the completion level of Block A was 100%, and it was reported that there was no information regarding the completion levels of Blocks B and C in the workplace file.

Since no information regarding the completion levels of Blocks B and C in the workplace file has been received, correspondence was made with the municipality again to inquire about the completion levels of Blocks B and C, and in the response from the municipality, it was reported that the completion level of Block B was 25% as of 31.12.2025, and the construction of Block C has not yet started.

In this case; research will be conducted over 5,000 m² corresponding to Block A (4,000 m²) and Block B (1,000 m²).

Example 5: YA İnşaat started a construction work with a structure class and group of III-B, with an area of 1,000 m² on 08.05.2025.

The employer applied to the Institution on 05.08.2026, requesting a partial certificate of no debt for 500 m².

In the letter sent by the municipality on 02.10.2026, it was reported that as of 22.09.2026, the completion level of the construction was 40%.

In this case, the work completion date will be taken as 22.09.2026, and the research process will be conducted over 400 m².

3) Other Matters Although a request for a partial certificate of no debt was made before the publication date of the Regulation on Amendments to the Social Insurance Procedures Regulation on 16.05.2026, if a partial certificate of no debt is issued on or after 16.05.2026, the date on which the employer applied for a partial certificate of no debt will not be taken into account, but the date on which the partial certificate of no debt is issued will be taken as the basis for the process according to section 9.19.4 of General Letter No. 2011/13.

Additionally, the start date of the part for which the research process has not been conducted after the issuance of a partial certificate of no debt will be the first insured notification date after the completion date taken as the basis in the research process conducted upon the request for a partial certificate of no debt; this is detailed in General Letter No. 2011/13.

If there has been no insured reporting after the completion date taken as the basis in the research process, the beginning date of the part of the construction for which research has not been conducted will be referred to the social security inspector for determination, and the process will be carried out based on the report prepared by the inspector.

The general condition for conducting research without a 25% reduction in the minimum labor cost rate is that there has been no workplace registration for the special nature construction work or that there has been workplace registration but no labor reporting has been made from this workplace.

In the research processes conducted for the purpose of issuing a partial certificate of no debt, if there is no labor reporting for the period following the date accepted as the completion date of the work, when the employer requests a certificate of no debt for the entire work or part of it, it will be necessary to conduct additional research for that period.

In this case, a reduction of 25% of the minimum labor cost rate applicable to the period for which there is no insured reporting will be required.

I kindly request your information and requirements.

İbrahim ÖZÇELİK Acting General Manager of Insurance Premiums (19.10.2026)

Resmi Kaynak

Bu makalenin dayandığı resmi belgeyi incelemek için:

Orijinal Metne Git